Navi Mumbai Metro Rail project includes a construction of an elevated line of 117.3km. The aim is to create comfortable and better quality services for the commuter through modern technology and reduce the travel time. The project will be integrated with the Mumbai Metro. A total of six corridors in the city have been identified to construct the project. Line 1 is planned to be developed in 3 Phases out of which Belapur-Pendhar section comes under Phase 1.

Systra Group in India was appointed to conduct the detail design studies for Navi Mumbai Metro Line 1. The project includes the detail design of complete Power supply and Traction including SCADA and Power Simulation studies for Navi Mumbai Metro Line 1 (Belapur to Pendhar) project. Systra Group in Indiaa was appointed as General Consultant to provide Detailed Design Engineering for complete implementation of the electrical system, for Belapur-Pendhar section, a part of the Corridor I, Phase I.

Systra Group in India provided services for the following tasks:

  • Preparation of preliminary design
  • Preparation of detail design
  • Preparation of simulation study report
  • Approval of designs from main client.
  • Construction support.