L&T Scomi Consortium has appointed Systra MVA to carry out a pre-construction traffic study for the Monorail Corridor, addressing all the issues associated with the development of a Temporary Traffic Management Plan (TTMP) required during construction and to prepare the Final Layout Plans. First phase of the monorail started operations on 2nd February 2014.

Systra Group in India was appointed as Traffic Consultant for Phase 1 Project.

As a Traffic Consultant, Systra Group in India provided these following services:

  • Traffic Data Collection & Analysis
  • Preparation of Comprehensive TTMP for the Entire Length of the Project
  • Final Layout Plans
  • Reporting and Presentation