Lucknow Metro Underground Section

Lucknow Metro Underground Section

The first phase of development of the Lucknow Metro Rail Project comprises two corridors for a total of 36km:
- North – South corridor from CCS Airport to Munshi Pulia, subject of this proposal.
- East –West corridor from Vasant Kunj to Charbagh Railway Station.

Systra Group in India has been appointed as Detail Design Consultant (DDC) for Architectural, E&M Works & Civil works proof checking for 3 underground stations (Hazratganj, Sachivalaya and Hussainganj) of Line of North - South Corridor. The scope of services includes:

  • Alignment review
  • Conceptual layout planning and preparation of design alternatives.
  • Bill of Quantities (BOQ), detailed specifications, cost estimates for Tender along with Tender drawings.
  • SES & CFD Analysis & Report.
  • Detailed Design of Architecture & Building Services of all UG Stations.
  • Proof Checking of Structural drawings for Station (permanent & temporary Structures), cut & cover ramp, cross passages & intermediate ventilation shafts.
  • Review of System Wide Contractor’s (SWC) working drawings.
  • Design support during the construction activities.
Top of the page
SYSTRA MVA Consulting (India) Private Limited Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600 Contact
Contact