Lucknow Metro Phase 1A

Lucknow Metro Phase 1A

Lucknow metro involves a construction of 35km of line with 34 stations divided in two corridors:
A. North south corridor: 23 km of line with 22 stations (Phase 1), from Amausi airport to Munshi Pulia section
B. East-West corridor: 12km of line with 12 stations (Phase2), from Vasant Kunj to Charbagh section.

The purpose of the Lucknow Metro project is to reduce traffic congestion, travel time and distance for the residents of Lucknow. The project once developed will reduce journey times on densely populated areas and major industrial locations.

Systra Group in India was appointed as General Consultant to provide Detailed Design for Civil Architectural and E&M works of Elevated Section of CCS Airport to Munshi Pulia (North-South Corridor) of Lucknow Metro under the Contract LKDD-01.

Systra Group in India’s Scope of Services includes:

  • Detailed design of:
    - Architectural planning for all elevated stations including track structure within the stations
    - Structural design of all required viaduct
    - Special spans
    - All building services
  • Intermodal transfer facilities for road and pedestrian traffic
  • Construction Reference Drawing
  • Good for Construction Drawing as Built Drawing
  • Construction Support
Top of the page

Read also

Glasgow Airport Strategic Transport Network Study
Glasgow Airport Strategic Transport Network Study
Glasgow Airport is a major centre of activity and requires high quality (...)
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
The Hong Kong and Mainland China governments, in conjunction with Hong Kong (...)
Lower Manhattan to New York JFK Airport Rail Access Study, USA
Lower Manhattan to New York JFK Airport Rail Access Study, USA
New York’s Lower Manhattan Development Corporation was considering proposals (...)
Brussels Airport Landside Transport Facility Planning
Brussels Airport Landside Transport Facility Planning
Brussels Airport (BRU), located to the north-east of the city, carried (...)
Three-level interchange in Tajikistan
Three-level interchange in Tajikistan
The first ever three-level interchange in Tajikistan, comprising a flyover, (...)
Delhi-Meerut Expressway
Delhi-Meerut Expressway
SYSTRA Group in India, recently reached a major milestone with the (...)
RVNL Vijaywada
RVNL Vijaywada
PMC services - 3rd line with Railway Electrification between Bitragunta – (...)
EDFC 3 (Pilkhani - Khurja)
EDFC 3 (Pilkhani - Khurja)
Systra Group in India was appointed by DFCCIL for providing project (...)
EDFC APL 1 (BHAUPUR-KHURJA)
EDFC APL 1 (BHAUPUR-KHURJA)
Systra Group in India, along with TYPSA S.A. of Spain, was appointed by (...)
Lamu-Garissa corridor
Lamu-Garissa corridor
Bridge across Damanganga river – Bharuch Bridges
Bridge across Damanganga river – Bharuch Bridges
City Development Plan for 11 towns
City Development Plan for 11 towns
SYSTRA MVA Consulting (India) Private Limited Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600 Contact
Contact