Delhi Metro Phase 3 Line 7 Underground Section

Delhi Metro Phase 3 Line 7 Underground Section

The underground Section of the Metro Line extends to over 19 KM with 12 Underground Stations with 4 being interchange amongst them.

Systra Group in India has been engaged as Detail Design Consultant (DDC) for Civil, Architectural and Building Services Works for the Line-7 (Mukundpur to Shiv Vihar corridor) of Phase-III of Delhi Metro Project. This is the longest of all the Delhi Metro lines built so far, and is popularly known as Inner Ring Road Line.

The scope of services includes:

  • Alignment review
  • Conceptual layout planning and preparation of design alternatives.
  • Bill of Quantities (BOQ), detailed specifications, cost estimates for Tender along with Tender drawings.
  • SES & CFD Analysis & Report.
  • Detailed Design of Architecture & Building Services of all UG Stations.
  • Proof Checking of Structural drawings for Station (permanent & temporary Structures), cut & cover ramp, cross passages & intermediate ventilation shafts.
  • Combined Services Drawing (CSD) for Tunnels.
  • Review of System Wide Contractor’s (SWC) working drawings.
  • Design support during the construction activities.
Top of the page

Read also

Glasgow Airport Strategic Transport Network Study
Glasgow Airport Strategic Transport Network Study
Glasgow Airport is a major centre of activity and requires high quality (...)
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
The Hong Kong and Mainland China governments, in conjunction with Hong Kong (...)
Lower Manhattan to New York JFK Airport Rail Access Study, USA
Lower Manhattan to New York JFK Airport Rail Access Study, USA
New York’s Lower Manhattan Development Corporation was considering proposals (...)
Brussels Airport Landside Transport Facility Planning
Brussels Airport Landside Transport Facility Planning
Brussels Airport (BRU), located to the north-east of the city, carried (...)
Three-level interchange in Tajikistan
Three-level interchange in Tajikistan
The first ever three-level interchange in Tajikistan, comprising a flyover, (...)
Delhi-Meerut Expressway
Delhi-Meerut Expressway
SYSTRA Group in India, recently reached a major milestone with the (...)
RVNL Vijaywada
RVNL Vijaywada
PMC services - 3rd line with Railway Electrification between Bitragunta – (...)
EDFC 3 (Pilkhani - Khurja)
EDFC 3 (Pilkhani - Khurja)
Systra Group in India was appointed by DFCCIL for providing project (...)
EDFC APL 1 (BHAUPUR-KHURJA)
EDFC APL 1 (BHAUPUR-KHURJA)
Systra Group in India, along with TYPSA S.A. of Spain, was appointed by (...)
Lamu-Garissa corridor
Lamu-Garissa corridor
Bridge across Damanganga river – Bharuch Bridges
Bridge across Damanganga river – Bharuch Bridges
City Development Plan for 11 towns
City Development Plan for 11 towns
SYSTRA MVA Consulting (India) Private Limited Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600 Contact
Contact