Faridabad line is the extension of Delhi Metro Line 6. It involved a construction of 13.1 km elevated line with 9 stations, including the architectural finishing, water supply, sanitary installation and external development, which start from Sarai Station to YMCA Chowk Station.

Systra Group in India acted as consultant to provide Detailed Design Consultancy for Faridabad Line Extension. It’s Scope of Work includes:

Structural Detail Design Included:

  • Viaduct - Superstructure - full span precast PSC U-girder & precast PSC I-girder
  • Viaduct - Substructure & Foundation - Precast PSC pier cap, Pier, Pile Cap & Pile
  • Stations - Track, Platform & Concourse beam/ slab, column, foundation
  • Foot Over Bridge for Pedestrian
  • Property Development
  • Good for Construction Drawings
  • Station Roof Design
  • Tenders (including drawings, BOQ and specifications)

Architectural Design of Stations included:

  • E&M, plumbing, fire-fighting etc., and structural design of PD areas for elevated stations including:
  • Architectural conceptual design and design alternatives
  • Tenders (including drawings, BOQ and specifications)
  • Finished & multimodal integration plans at interchange stations with other modes/ property development

E&M Services included:

  • Preliminary & Detail design
  • Tenders (including drawings, BOQ & specifications)
  • Detailed design for stations (E&M activities include Electricity, HVAC, Plumbing, Fire Fighting & Lighting studies)