Chhatrapati Shivaji International Airport, Mumbai Modernization

Chhatrapati Shivaji International Airport, Mumbai Modernization

The new iconic Terminal 2 is state-of-the-art 4 level integrated terminal with an area of over 4,39,000 sq. mts. and include new taxiways and apron areas for aircraft parking designed to cater to 40 million passengers per annum and one million tons of cargo annually.

Systra Group in India was appointed by Mumbai International Airport (MIAL) for Review, Preparation and Updation of Traffic and Transportation Master Plan (land side development) for the mixed use development in 200 acres.

The study scope includes;

  • Preparation of Traffic & Transportation Master Plan
  • To review proposed CSIA master plan both at macro (over all CSIA area level) and micro levels (individual plot level) from traffic & transportation point of view.
  • To provide comprehensive traffic & transportation plan for master plan for all the phases based on the CSIA master plan requirements.
Top of the page

Read also

Glasgow Airport Strategic Transport Network Study
Glasgow Airport Strategic Transport Network Study
Glasgow Airport is a major centre of activity and requires high quality (...)
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
The Hong Kong and Mainland China governments, in conjunction with Hong Kong (...)
Lower Manhattan to New York JFK Airport Rail Access Study, USA
Lower Manhattan to New York JFK Airport Rail Access Study, USA
New York’s Lower Manhattan Development Corporation was considering proposals (...)
Brussels Airport Landside Transport Facility Planning
Brussels Airport Landside Transport Facility Planning
Brussels Airport (BRU), located to the north-east of the city, carried (...)
Three-level interchange in Tajikistan
Three-level interchange in Tajikistan
The first ever three-level interchange in Tajikistan, comprising a flyover, (...)
Delhi-Meerut Expressway
Delhi-Meerut Expressway
SYSTRA Group in India, recently reached a major milestone with the (...)
RVNL Vijaywada
RVNL Vijaywada
PMC services - 3rd line with Railway Electrification between Bitragunta – (...)
EDFC 3 (Pilkhani - Khurja)
EDFC 3 (Pilkhani - Khurja)
Systra Group in India was appointed by DFCCIL for providing project (...)
EDFC APL 1 (BHAUPUR-KHURJA)
EDFC APL 1 (BHAUPUR-KHURJA)
Systra Group in India, along with TYPSA S.A. of Spain, was appointed by (...)
Lamu-Garissa corridor
Lamu-Garissa corridor
Bridge across Damanganga river – Bharuch Bridges
Bridge across Damanganga river – Bharuch Bridges
City Development Plan for 11 towns
City Development Plan for 11 towns
SYSTRA MVA Consulting (India) Private Limited Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600 Contact
Contact