Bangalore Metro Phase 2

Bangalore Metro Phase 2

Bangalore metro project phase II involves the construction of 72 km of metro lines with 69 stations, in order to decongest the city traffic by providing a reliable, seamless transport system.

In phase II, it includes the construction of the extensions of the two corridors on first phase (East-West and North-South), and two new lines.

The new lines are the following:
- RV Road to Bommasandra line: 16,5 km of elevated line with 16 stations
- Gottigere-IIM-B and Nagawara: 21.2 km of line with 18 stations (6 are elevated and 12 are underground stations)

Systra Group in India has appointed as a General Consultant to provide detailed design consultancy services for viaduct and stations for section R5 extension (From R.V. road station to Bommasandra station).

The scope of work R5 extension covers the preparation of:

  • All architectural and landscaping works
  • The detailed traffic management plan
  • BOQ’s
  • Detailed designs of:
    - 16 elevated stations
    - Architectural and landscaping works
    - E&M works of stations
Top of the page

Read also

Glasgow Airport Strategic Transport Network Study
Glasgow Airport Strategic Transport Network Study
Glasgow Airport is a major centre of activity and requires high quality (...)
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
Feasibility Study on Rail Link between Hong Kong and Shenzhen Airports
The Hong Kong and Mainland China governments, in conjunction with Hong Kong (...)
Lower Manhattan to New York JFK Airport Rail Access Study, USA
Lower Manhattan to New York JFK Airport Rail Access Study, USA
New York’s Lower Manhattan Development Corporation was considering proposals (...)
Brussels Airport Landside Transport Facility Planning
Brussels Airport Landside Transport Facility Planning
Brussels Airport (BRU), located to the north-east of the city, carried (...)
Three-level interchange in Tajikistan
Three-level interchange in Tajikistan
The first ever three-level interchange in Tajikistan, comprising a flyover, (...)
Delhi-Meerut Expressway
Delhi-Meerut Expressway
SYSTRA Group in India, recently reached a major milestone with the (...)
RVNL Vijaywada
RVNL Vijaywada
PMC services - 3rd line with Railway Electrification between Bitragunta – (...)
EDFC 3 (Pilkhani - Khurja)
EDFC 3 (Pilkhani - Khurja)
Systra Group in India was appointed by DFCCIL for providing project (...)
EDFC APL 1 (BHAUPUR-KHURJA)
EDFC APL 1 (BHAUPUR-KHURJA)
Systra Group in India, along with TYPSA S.A. of Spain, was appointed by (...)
Lamu-Garissa corridor
Lamu-Garissa corridor
Bridge across Damanganga river – Bharuch Bridges
Bridge across Damanganga river – Bharuch Bridges
City Development Plan for 11 towns
City Development Plan for 11 towns
SYSTRA MVA Consulting (India) Private Limited Vatika Mindscapes, Mathura Road, Faridabad T.(+91) 129 668 5600 Contact
Contact